Maintenance; Every Day; Every Three Month; Every 300 Hours Of Operation Or Every Year - Chicago Pneumatic SAW 14 Instrucciones De Seguridad Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 62
SAW 14, 16, Cart

Maintenance

Regular maintenance is a basic requirement for the
continued safe and efficient use of the machine.
Follow the maintenance instructions carefully.
Before starting maintenance on the machine,
clean it in order to avoid exposure to hazardous
substances. See "Dust and fume hazards"
Use only authorised parts. Any damage or
malfunction caused by the use of unauthorised
parts is not covered by warranty or product
liability.
When cleaning mechanical parts with solvent,
comply with appropriate health and safety
regulations and ensure there is satisfactory
ventilation.
For major service of the machine, contact your
nearest authorised workshop.
After each service, check that the machine's
vibration level is normal. If not, contact your
nearest authorised workshop.

Every day

Before undertaking any maintenance on hydraulic
machines, always switch off the oil supply and bleed
the machine by depressing the start and stop device
Then disconnect the hydraulic hose from the
machine.
Clean and inspect the machine and its functions
each day before the work commences.
Check if the spindle thread, the guard (the disc
may not touch the guard) and the flange are in
good condition.
Conduct a general inspection for leaks, damage,
and wear.
Change damaged parts immediately.
Replace worn components in good time.
Make sure that all the attached and related
equipment, such as hoses and flow dividers are
properly maintained.
If the machine has been dropped, carefully
examine the disc.
Ensure that the disc dimensions are compatible
and that it fits the spindle.
3392 5186 90a | Original instructions
Safety and operating instructions
Always plug hoses and nipples with clean and
tight plugs when dismounting.
Check tightness of nuts, bolts, screws and hose
fittings after the first days of operation and
thereafter in accordance with the maintenance
schedule.

Every three month

Check tightness of nuts, bolts, screws and hose
fittings.
Every 300 hours of
operation or every year
Check moving parts, seals and bolts for wear and
cracks. Replace if necessary.
Check the function of the machine.

Storage

Check that the machine is properly cleaned before
storage.
Store the machine in a dry place.
Keep the machine and tools in a safe place, out
of the reach of children and locked up.

Disposal

A used machine must be treated and scrapped in
such a way that the greatest possible portion of the
material can be recycled and any negative influence
on the environment is kept as low as possible.
Before a used machine is scrapped it must be
emptied and cleaned from all hydraulic oil. The
remaining hydraulic oil must be deposited and any
negative influence on the environment is to be kept
as low as possible.
17

Publicidad

Tabla de contenido
loading

Productos relacionados para Chicago Pneumatic SAW 14

Este manual también es adecuado para:

Saw 16Saw cart

Tabla de contenido