Every Day; Periodic Maintenance; Assembly Instructions - Chicago Pneumatic CP 0315 Instrucciones De Seguridad Y Funcionamiento

Ocultar thumbs Ver también para CP 0315:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 52
CP 0315

Every day

Before undertaking any maintenance or changing
the insertion tool on pneumatic machines, always
switch off the air supply and bleed the machine by
depressing the start and stop device. Then
disconnect the air hose from the machine.
Clean and inspect the machine and its functions
each day before the work commences.
Conduct a general inspection for leaks and
damage.
Check that the air inlet nipple is tightened and
that the claw coupling is free from damage.
Check the function of the throttle handle. Make
sure that it returns to its stop position when it is
released.
Change damaged parts immediately.
Replace worn components in good time.
Make sure that all the attached and related
equipment, such as hoses, water separators and
oilers are properly maintained.

Periodic maintenance

After each operating period of approximately 100
working hours or three times a year the machine
must be dismantled and all parts be cleaned and
checked. This work must be performed by authorized
staff, trained for this task.
9800 0554 90b | Original instructions
Safety and operating instructions

Assembly instructions

B
C
A.
Thin side of the outer race pointing in the
direction of the arrow.
Torque: 6−7 lbf/ft (8−9 Nm)
B.
C.
Torque: 6−7 lbf/ft (8−9 Nm)
D.
Torque: 6−7 lbf/ft (8−9 Nm)
With parts in place, the gear housing should
E.
be approximately half filled with grease. Use
a good grade ball bearing grease. Do not
over-lubricate gearing, excessive grease will
cause overheating.
At each inspection, clean open bearings and
F.
fill ¼ of the bearings open space with a good
grade ball bearing grease.
E
F
A
D
15

Publicidad

Tabla de contenido
loading

Tabla de contenido