Service And Repair - Leister VACUUM BOX Instrucciones De Funcionamiento

Ocultar thumbs Ver también para VACUUM BOX:
Tabla de contenido

Publicidad

End of the tests
Danger of fire and explosion.
Do not store any flammable materials in the box of the VACUUM PUMP. Allow the
VACUUM PUMP to cool down before putting it into storage.
Once testing has finished, disconnect the power supply cord from the electricity
supply.
• Remove the hose (7) from the VACUUM PUMP (1) and VACUUM BOX (2) / VACUUM BELL (2) and place it in
the case (3).
• Close the case (3).
Maintenance
• For further information on maintenance, please observe the Operating
Instructions of the VTE3 Picolino VACUUM PUMP.
Accessories
• Only Leister accessories may be used for technical and safety-related reasons.
Training course
• Leister Technologies AG and its authorized Service points offer free welding courses and introductory training class-
es. Information at www.leister.com.

Service and repair

• Repairs shall be assigned exclusively to authorized Service points . These guarantee a professional and reliable
repair service within a useful deadline with original spare parts in accordance with circuit diagrams and spare
parts lists.
Warranty
• The guarantee or warranty rights granted for this device by the direct distribution partner/salesman apply after
the date of purchase. In the event of a guarantee or warranty claim (verification by invoice or delivery note),
manufacturing or processing errors will be rectified by the sales partner through replacement delivery or repair.
• Other guarantee or warranty claims are excluded within the framework of mandatory law.
• Damages resulting from natural wear, overload, or improper handling are excluded from the warranty.
• No guarantee or warranty claims exist for devices that have been converted or modified by the purchaser.
14

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vacuum bell

Tabla de contenido