Maxon MAX SOL Instrucciones página 13

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

LIFT CORPORATION Sht. 13 of 30 DSG#
Ensure there is suffi cient slack in the electrical cables, between the 2 clamps on
the wall and door of the battery box. Slack will allow door to open fully and prevent
damage to the cables.
11. If home run cable is too long, cut cable length to fi t, and splice wire
ends together with butt splices (Kit items) (FIG. 13-1A). Secure
cable to battery box with metal clamps (Kit items) (FIG. 13-1). Use
pre-drilled holes in battery box to attach cable clamps (FIG. 13-1).
HOME RUN
CABLE
FIG. 13-1A
© MAXON Lift Corp. 2020
Draft 12/21/2020
CAUTION
CONNECTIONS
BUTT SPLICE
(2 PLACES)
LOCK NUT
(2 PLACES)
M-20-17
BATTERY
CABLE
CABLE
CLAMPS
FLAT WASHER
(2 PLACES)
SECURING HOME RUN CABLE
FIG. 13-1
Rev. - Date: 12/09/20
CAP SCREW
(2 PLACES)
CHARGE
CONTROLLER
HOME RUN
CABLE
CONNECTIONS

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

211611-105-50M-20-17

Tabla de contenido