Axis T99A Guia De Instalacion página 19

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 129
1
Power cable (not included)
2
I/O cable (optional, not included)
3
Network cable (not included)
4
Cable gland
5
Transparent base unit cover
8. Fit cable glands on the cables. See Cable thickness on page 36.
9. Insert the power, I/O and network cables including the cable glands through the holes in
the transparent base unit cover and arrange the cables as shown in the illustration above.
NO TICE
TICE
NO
NO
TICE
If you use both an optical fibre cable and an RJ45 cable for network connectivity, route the
optical fibre cable through the same cable gland as the I/O cable. Apply a sealant between
the cables and the cable gland to prevent leakage. See Install the network link on page 22
for more information on different network connectivity options.
10. Replace the transparent base unit cover on the base unit and fit the cable glands inside
the holes.
AXIS T99A Positioning Unit
19

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

T99a10T99a30

Tabla de contenido