Chapter 9: Connect Power; Chapter 10: Operation Test; Chapter 11: Installing Completion; System Maintenance - EVGA HADRON HYDRO Manual De Instrucciones

Ocultar thumbs Ver también para HADRON HYDRO:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
11. Take the last piece of hose, and repeat steps 6 and 7. Push the hose out through the other
rubber hole cover, and slide it back a small amount to pull the rubber flaps back inside (aesthetics
only) rotate the other extension to where it lines up with the threads and thread it in by rotating
the hose form the inside of the case until it is tight.
12. Add in the anti kink coil to the open end of the hose,
you will need to push it all the way back, and keep it in
the open end. Thread the compression fitting into the
pump base until snug. Flex the tube and connect the
hose onto the end of the fitting, slide the cap down and
tighten it onto the fitting.
At this point the loop should be sealed and complete.

Chapter 9: Connect Power

▪ Connect pump and LED with the 3-pin
connector and connect the power
supply with the 4-pin connector.
English
16

Chapter 10: Operation Test

1. Please disconnect all powers inside the main frame (including motherboard / hard drives and
CD-ROM). Test run the system for 20 min, check if all parts are correctly connected. The
included 24 pin short can assist with allowing the system to run without connecting it to a
motherboard.
2. Monitor the fluid level, and add more fluid if necessary with included funnel.
3. After system test run is complete, you can
start using the liquid cooling system.

Chapter 11: Installing Completion

11-1 System Maintenance

We value the reliability and convenience during the development of this product, however you
would still need to note the following:
English
17

Publicidad

Tabla de contenido
loading

Tabla de contenido