Electrical Installation - WEG SCA-05 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

WEG Item
0307.8347
SPC4-03m-4X6.0-S
0307.8348
SPC4-06m-4X6.0-S
0307.8349
SPC4-09m-4X6.0-S
0307.8350
SPC4-12m-4X6.0-S
0307.8351
SPC4-15m-4X6.0-S
4. Electromagnetic Compatibility Kit (CEM Kit) suitable to the servodrive model in accordance
to:
WEG Item
417110071
417110072
417110073
417110074

1.4 Electrical Installation

The supply network must be connected to the filter input, on the side where information L1,
L2 and L3 are located. SCA-05 must be connected to the filter output, on the side where
information L1', L2' and L3' are located. The cables must be the shortest possible.
The Earth (PE) must be connected at the filter earthing point. SCA-05 must have its Earth (PE)
connected to the filter.
Only for SCA-05 24/48 Servodrives: A choke comes along with filter model B84143-A50-
R105 (used with the SCA-05 24/48). The cables of the SCA-05 supply phases must pass
through this choke, according to figure 3.
L1
L2
L3
Network
Figure 1 - Installation of the supply network in the SCA-05 4/8 and 5/8MF
Power Cable
Narrative
Power Cable, 4 wires,
Table 5 – CEM Kit for each servodrive model
CEM Kit for SCA-05 4/8 MF and SCA-05 5/8 MF
L1'
L2'
L3'
Description
03m (118.11in)
06m (236.22in)
09m (354.33in)
6mm²
12m (472.44in)
15m (590.55in)
Description
CEM Kit for SCA-05 4/8
CEM Kit for SCA-05 8/16
CEM Kit for SCA-05 24/48
Length
SCA-05
30/60
9

Publicidad

Tabla de contenido
loading

Tabla de contenido