Preparation For Operation - DeWalt DXH80KTHC Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Slide the partially assembled axle through the wheel support frame.
5. Slide the spacer onto the axle next to the wheel support.
6. Slide the wheel, then large last large lock nut onto the axle. Using two adjustable wrenches
hold both nuts and tighten. DO NOT OVERTIGHTEN
7. Install the caps over the lock nuts to finish the wheel assembly.

PREPARATION FOR OPERATION

1. Check the heater for possible shipping damage. If any is found, immediately
contact the manufacturer at 855-805-5745.
2. Follow all of the "Precautions".
3. Fill the fuel tank with clean kerosene. In extremely cold weather, condensation may
develop in the tank and it is recommended that a tablespoon of de-icer be added
for each gallon (4 liters) of fuel in the tank. When filling the heater, use at least 2
gallons (8 liters) of fuel. Be sure heater is level and do not overfill. Use a funnel or
can with a long fill spout.
IMPORTANT: Before filling fuel tank the first time or after extended storage periods, drain the fuel
tank of any moisture or condensation.
4. Locate heater at a safe distance from combustible materials.
HEATER START UP
1. Turn thermostat to lowest setting and make sure "On/Off" switch is "Off".
2. Plug the heater into a grounded 115V, 60 Hz, 1 Ø outlet.
3. Start heater by pushing toggle switch to "On" position (light signifies switch is in
"On" position.)
4. Adjust thermostat to desired setting. Heater will cycle on/off as heat is required.
NOTES FOR ALL MODELS:
• In cold weather (below 10 °F [-12.2 °C] ) starting may be improved by hold-
ing a finger over the vent hole of the pump adjustment screw cap until the
heater starts.
• This unit is equipped with an interrupt circuit. The reset is integrated into
the "On/Off" switch. If the unit does not start, toggle the switch to "Off",
wait 5 min, and toggle the switch to "On"
• EXTENSION CORD REQUIREMENTS: Up to 100' (30.5 M) use 16 awg
conductor. 101' - 200' (30.5 - 61.0 m) use 14 awg conductor.
HEATER SHUT DOWN
Push "On/Off" switch to "Off" position. For extended shutdown, unplug heater
from power source.
HEATER RESTART AFTER SAFETY SHUTDOWN
1. Toggle switch to "OFF" position
2. Wait 5 minutes
3. Restart
Maintenance and Storage
WARNING: To prevent personal injury, unplug the heater from the wall outlet before servicing.
For maximum efficiency and trouble-free service, make the following periodic
maintenance, cleaning and inspections.
ADJUSTING PUMP PRESSURE
Due to varying fuel viscosities and normal component wear the pump pressure on
this heater may need to be adjusted.
FUEL PRESSURE ADJUSTMENT SCREW
(located at the rear of the heater)
PRESSURE GAGE
5

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dxh140kthcDxh210kthcx

Tabla de contenido