Condensate Drain Connection - Ferroli ECONCEPT 51 A Instrucciones De Uso

Ocultar thumbs Ver también para ECONCEPT 51 A:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
4.
Switch on the power to the entire cascade
5.
After the "FH" procedure, check the correct operation of the cascade:
Module 1: arrow symbol at top left of the display
Module 2: arrow symbol at bottom right of the display
Module 3: arrow symbol at bottom right of the display
Module 4: arrow symbol at top right of the display
If this does not occur, disconnect the power and check the wiring in fig. 23.
Settings
All adjustments must be made on all the modules.
Possible faults
If the electrical connection of a module is disconnected for any reason, module 1 will ac-
tivate fault F70.
If the electrical connection of a module is disconnected for any reason, the next module
will activate fault F71.
3.5 Fume ducts
The unit is a "C type" with sealed chamber and forced draught, the air inlet and fume out-
let must be connected to one of the following extraction/suction systems. The unit is ap-
proved to operate with all the Cxy and Bxy flue configurations given on the dataplate
(some configurations are given by way of example in this section). Some configurations
may be expressly limited or not permitted by law, standards or local regulations. Before
proceeding with installation, check and carefully observe the above-mentioned prescrip-
tions. Also, comply with the provisions on the positioning of wall and/or roof terminals and
the minimum distances from windows, walls, ventilation openings, etc.
B
This C-type unit must be installed using the inlet and fume outlet ducts supplied
by the manufacturer in accordance with UNI-CIG 7129/92. Failure to use them
automatically invalidates every warranty and relieves the manufacturer of any
liability.
For fume exhaust pipes longer than 1 metre, during installation take in account
A
the natural expansion of the materials when the boiler is operating.
To prevent deformations, leave an expansion space of approx. 2 ÷ 4 mm for every metre
of pipe.
2 ÷ 4 mm
fig. 24 - Expansion
Connection with coaxial pipes
fig. 25 - Examples of connection with coaxial pipes (
For coaxial connection, fit the unit with one of the following starting accessories. For the
wall hole dimensions, refer to fig. 33. Any horizontal sections of the fume exhaust must
be kept sloping slightly towards the boiler, to prevent possible condensate from flowing
back towards the outside and causing dripping.
1000
Ø80
A
fig. 26 - Starting accessory for coaxial ducts
A - Kit 60/100 - 1KWMR53A
B - Kit 60/100 - 1KWMA71W
C - Kit 80/125 - 1KWMA74Y
42
EN
= Air /
= Fumes)
Ø125
Ø100
Ø80
Ø60
Ø80
B
C
Ø80
cod. 3540S566 - Rev. 01 - 02/2015
Before carrying out installation, check with table 2 that the maximum permissible length
is not exceeded, taking into account that every coaxial bend gives rise to the reduction
indicated in the table. For example, a Ø 80/125 duct comprising a 90° bend + 1 horizontal
metre has a total equivalent length of 1.5 metres.
Table. 2 - Max. length coaxial ducts
Max. permissible length
Reduction factor 90° bend
Reduction factor 45° bend
Connection with separate pipes
C
53
fig. 27 - Examples of connection with separate pipes (
Separate Ø80 ducts can be connected directly to the unit.
Before proceeding with installation make sure the maximum permissible length has not
been exceeded, by means of a simple calculation:
1.
Completely establish the layout of the system of split flues, including accessories
and outlet terminals.
2.
Consult the table 4 and identify the losses in m
ponent, according to the installation position.
3.
Check that the sum total of losses is less than or equal to the maximum permissible
length in table 3.
Table. 3 - Max. length separate ducts
Max. permissible length
Table. 4 - Accessories
Ø 80
PIPE 1 m M/F
BEND 45° M/F
90° M/F
PIPE SECTION with test point
TERMINAL air, wall
fumes, wall with anti-
wind

3.6 Condensate drain connection

The boiler is equipped with an internal trap C for condensate draining.
Fit the inspection union A on the trap, also fitting seal B. Press the flexible tube D on
about 3 cm and secure it with a clamp.
Fill the trap with approx. 0.5 l. of water and connect the flexible tube to the drainage sys-
tem.
1.
Fit the inspection union A on the trap, also fitting seal B. Press the flexible tube D
on about 3 cm and secure it with a clamp.
2.
Fill the trap with approx. 0.5 l. of water.
3.
Connect the flexible tube to the drainage system.
D
fig. 28 - Condensate drain connection
ECONCEPT 51 A
Coaxial 60/100
Coaxial 80/125
2 m
1 m
0.5 m
0.5 m
0.25 m
B
23
= Air /
(equivalent metres) of every com-
eq
Separate ducts
20 m
eq
Losses in m
Air
Fume exhaust
inlet
Vertical
1KWMA83W
1.0
1.6
1KWMA65W
1.2
1KWMA01W
1.5
1KWMA70W
0.3
1KWMA85A
2.0
1KWMA86A
-
0,5lt
C
B
A
1
2
12 m
C
13
= Fumes)
eq
Horizontal
2.0
1.8
2.0
0.3
-
5.0
3