Prepare The Site - Kohler Artifacts K-21000-P5-0 Guía De Instalación Y Cuidado

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation with Claw Feet
Installation with Pedestal Base

1. Prepare the Site

Determine the location of the bath.
Make sure that the subfloor is level, and provides adequate support for the bath.
IMPORTANT! To ensure a successful installation, install the bath on a level finished floor.
Install the finished floor material.
Cut out the template on the cut-out line, and use the template to determine the installation location.
For Installation with Claw Feet: Mark the drain location on the floor.
For Installation with Pedestal Base: Mark the pedestal base, leg, and drain locations on the floor.
Install the water supply and drain lines.
Kohler Co.
3
1349045-2-A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Artifacts k-21000-w-0

Tabla de contenido