Battery Installation - Beta 599 DGT/20 Instrucciones

Ocultar thumbs Ver también para 599 DGT/20:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
SPECIFICATIONS
Model
N°.
599 DGT/20
Accuracy
Operation Mode
Unit Selection
Head Type
Gear Teeth
Buttons
Bright LED
Battery
Battery Life (Continuous Operation)
Battery Life (Standby)
Operating Temperature
Storage Temperature
Humidity

BATTERY INSTALLATION

– Remove the battery cover.
– Insert two R6/AA batteries matching the -/+ polarities of the battery to the battery compartment.
– Put on the battery cover and rotate it tightly according to the following figures.
POWER ON AND RESETTING WRENCH
– Press
to power on the digital torque wrench.
– Usually press
ATTENTION:
If an external force is applied to the torque wrench during the power-on/reset or wake up period, an
initial torque offset will be found in the memory.
Operation
Range
(N-m)
40-200
Beta 599 DGT/20
to reset the digital torque wrench before using it.
Square
Drive
Setting
(inches)
Range
1/2"
10-200
CW: ±2%
CCW: ±3%
Peak Hold / Track
N-m, ft-lb, in-lb, kg-cm
Reversible ratchet
72
4
12 LEDs / 4 red + 8 green
AA (R6) x 2
~ 110 hours
~ 1 year
-10°C / 60°C
-20°C / 70°C
Up to 90% non-condensingone
+
Alarm
Lenght
(N-m)
Battery and cover
(mm)
519

Publicidad

Tabla de contenido
loading

Tabla de contenido