Care And Cleaning - Rampage TrailView Tube Half Doors Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Steps
Now with everything installed on the doors you can slide the door onto the factory hinge pins. Open the latch teeth carefully close the door on the vehicle, this will
help to align the latch and pins into their correct position.
10
Now tighten the hinge bolts while the door is closed. Tighten the latch but
leave loose enough for minor adjustment the key to adjusting the latch is
to make sure the latch tooth has full rotation, and the notched tooth does
not catch on the vehicle's striker. Once you are satisfied with the
alignment tighten all hardware.
11

Care and Cleaning

• Wash with mild soap & dry with a clean cloth.
• Oil or grease hinge pins periodically.
Congratulations!
Your new TrailView Tube Doors™ is installed! Now go enjoy the ride.
Thank you for purchasing one of the many quality Rampage® products offered by Lund International, Inc. We take the ultimate pride in our
products and hope you receive years of satisfaction from your investment. We have made every effort to guarantee that your product is
of the highest quality for fit, durability, finish, and ease of installation.
NOTE: Actual application may vary slightly from illustrations.
800-241-7219 • Visit us at Rampageproducts.com
Rampage Products is a trademark of Lund International, Inc.
Optional: Install factory side mirrors. Using 2 stand-off supports and 2 screws
to mount side mirror to tube door as shown below. Once you are satisfied with
the alignment tighten all hardware. If you choose not to install the mirror the
plastic plug cap can be installed into holes.
TOP
BOTTOM
12
Page 4 of 4

Publicidad

Tabla de contenido
loading

Tabla de contenido