- - - reserved to the installer technician - - -
B
HYDRAULIC INSTALLATION
Hydraulic installation MUST be performed by qualified personnel observing the appropriate law
provisions and safety standards.
The manufacturer declines any liability if the product is
installed without observing the standards and prescriptions
indicated below.
C
ELECTRICAL INSTALLATION
Make sure the building electrical system is:
- in compliance with the standards in force at the date of installation or with the national
installation standard in force (for Italy, CEI 64.8);
- protected by a residual-current device.
Make sure the earth connection is efficient and in compliance with national provisions.
volume 1
volume 0
D
HYDRAULIC CONNECTION
Connect wall water connections (cold-hot) to the respective connections behind the column.
During connection, pay attention to the symbols on the taps (cold-hot water).
- Red = hot water (C)
- Blue = cold water (F)
For connection diagram, please see pages "74" and "75"
INSTALLATION
ceiling
volume 3
volume 2
0,60m
(According to local provisions and rules)
(if necessary)
out of volume
volume 3
2,40m
15
EN
out of
volume