Installation (continued)
3
Connecting the quick connect
assembly
□ Connect the quick connect assembly (H) to the
bottom of valve bodies (1) as show.
1
H
4
Attaching the quick connector
to the receiving block
□
Push the quick connector (1) rmly upward and
attach it to the receiving block (2). Pull down
moderately to ensure the connection has been
made.
□
After connecting the hose, install the weights (I)
at the lowest point of the hose.
5
Please contact (800) 880-8164 for further assistance.
I
2
1
www.schonsimplymodern.com