H-8771, H-8772
INDUSTRIAL AIR
CONDITIONER
TOOLS NEEDED
Phillips Screwdriver
Before installing and using the industrial A/C system,
read these instructions carefully for proper usage and
all safeguards. Keep them for future reference.
AIR CHUTE
A/C systems come equipped with air chutes.
1.
Remove air chutes from accessories box. Place
unfinished end of air chute onto collar. Clamp with
supplied clamp using a 5/16 nut driver or a flat
screwdriver. (See Figure 1)
Figure 1
Air Chute
PAGE 1 OF 21
1-800-295-5510
uline.com
Flathead Screwdriver
INSTALLATION
Collar
Clamp
5/16" Wrench
CONDENSATE TANK
The system comes standard
with an internal 3.5-gallon
condensate tank. (See Figure 2)
The internal condensate tank
is equipped with a float switch
that shuts the unit down and
alerts operators with an alarm.
It displays CF (Condensate
Full) when the condensate
tank is full. This prevents
accidental water overflow on
floor. To continue operation, the collection bottle must
be removed, emptied and re-installed. Turning the A/C
unit off will stop the alarm.
1.
Remove the float switch jack by pulling it straight
back. Remove the condensate bottle by pushing
the front of the bottle slightly downward and then
pull the bottle out.
2. Remove the cap threaded onto the bottle by turning
counterclockwise. Empty collected water and
return cap back onto bottle by turning clockwise.
Do not cross thread cap upon installation. Tighten
cap to the point where the angle connector on the
condensate bottle aligns with the nipple extending
out from the drain pan on the A/C unit. Insert bottle
by pushing down slightly to clear extended drain
pan nipple. Ensure drain pan nipple is inside of
angle connector and cap is snug and not cross-
threaded to avoid water leakage.
3. Install the float switch jack by pushing it straight in.
Alarm will sound if pin is not fully inserted. Continue
normal operation.
Para Español, vea páginas 8-14.
Pour le français, consulter les pages 15-21.
Figure 2
Switch Jack
0920 IH-8771