QE = Control board
SS = Defrost probe
ST = Temperature probe
Vm = Fan motor
Vv = Display case fan
19 - Instructions for the defrosts synchronization of multiplexed cabinets with instrument EVZ000
Please refer to the explanation at page 10. The connecting cable is supplied in the multiplexing kit.
20 - Conformity Declaration
A copy of the declaration of product conformity can be requested by filling in the form available a the internet address:
http://www.oscartielle.it/conformity
25