Installing a submersible well pump, continued.
Process D: Steps 1 through 4, At The House
STEP
1
Thread 10" x 1" nipple into pressure tank. Thread
tank cross into nipple so that the two 1/4" holes
in tank cross face upward. Thread street tee into
front of tank cross. Thread pressure relief valve
into top of street tee and thread 3/4" boiler
drain into front of street tee.
3/4" PRESSURE
RELIEF VALVE
STEP
2
Thread 1" male PVC adapter into the inlet side
of tank cross.
3/4" PRESSURE
RELIEF VALVE
DRAIN
CONSUMER HOT-LINE:
1-800-942-3343
Monday–Friday 7 AM to 5 PM EST
www.waterace.com
23833A09
3/4" PRESSURE
RELIEF VALVE
T
ANK CROSS
3/4" BOILER
DRAIN
1" MALE PVC
ADAPTER
1" MALE PVC
ADAPTER
(USA only)
STEP
3
Thread one end of 1/4" x 3" brass nipple into
bottom of pressure switch. Thread other end into
left 1/4" hole of tank cross. Thread pressure gauge
into right 1/4" hole of tank cross. Cut and cement
as many sections and couplings of PVC pipe needed
to connect the 1" male PVC adapter on the gate
valve to 1" male PVC adapter on the pitless slot
assembly. Complete installation should look like
the drawing on the following page.
1/4" X 3"
NIPPLE
A typical submersible well
pump installation
1/4" X 3"
NIPPLE
9
PRESSURE
SWITCH
PRESSURE
GAUGE
1" MALE PVC
ADAPTER
PRESSURE
SWITCH
PRESSURE
GAUGE
Bag #23834A004
1/4"
NIPP