Uline H-8325 Manual Del Usuario página 3

Lockers de dos puertas para artículos grandes
Ocultar thumbs Ver también para H-8325:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Place first piece of four-piece shelf on top of rails
with flush side facing up. Bolt first piece to shelf rails
using two short hex head bolts. Bolts will go through
shelf rails and into threaded holes in shelves. Repeat
for the next three shelf pieces. (See Figure 8)
Figure 8
ANCHORING TO CONCRETE FLOOR
1. Verify that bulk storage locker is positioned in the
desired location. Mark floor where holes will be drilled.
2. Using a 5/16" diameter masonry drill bit, drill a hole
in all marked locations approximately 2.5" deep.
3. Clean out debris and dust from inside the holes.
4. Insert anchor bolt and anchor sleeve through the
holes in locker and into the drilled hole so that the top
of the sleeve is flush with floor and threaded bolt sticks
out of the floor. Slightly tap down the anchor bolt with
a hammer if needed. (See Figure 9)
Figure 9
5. Slide washer over each anchor bolt. Then tighten nut
until anchor bolt is secure.
PAGE 3 OF 15
ASSEMBLY CONTINUED
SECURING TO FLOOR OR WALL
NOTE: Shelves can be installed with one-way
security bolts (included) for additional security,
instead of short hex head bolts.
WARNING! The one-way security bolts can be
installed normally, but cannot be removed.
These security bolts are a PERMANENT security
solution that cannot be undone.
5. Tighten all bolts and nuts fully.
SECURING TO WALL
1. Verify that bulk storage locker is positioned in the
desired location. Mark wall where holes will go.
2. Drill a hole in all marked locations approximately
1.5" deep.
3. Using a Phillips head screwdriver, mount locker to
wall using (4) masonry screws on each side panel.
(See Figure 10)
Figure 10
0721 IH-8325

Publicidad

Tabla de contenido
loading

Tabla de contenido