1. BEFORE YOU BEGIN
Please read these instructions carefully to familiarize
yourself with the required tools, materials, and installation
sequences. All information in these instructions is based
on the latest product information available at the time
publication. Kohler Co. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
TOOLS NEEDED
S
Measuring Tape
S
Hacksaw (minimum 32 teeth/inch blade)
S
Miter Box
S
Hammer
S
Electric Drill
S
Caulking Gun
S
Step Ladder
MATERIALS REQUIRED
S
Glass Cleaner
2. FRAMEWORK REQUIREMENTS
CONSTRUCT FRAMING
To assure screws are set in studs, locate framework as
defined in recommended or alternate framework
illustrations.
NOTE: Screw anchors are provided if #8 screws do not
line up with studs.
NOTE: Allow adequate clearance height for steam dome.
Steam dome requires 9" (22.9cm) clearance above
Glassworks shower doors. Total clearance height re-
quired is 91" (231.1cm) minimum: Whitecap receptor (if
used) is 10" (25.4cm), Glassworks shower door is 72"
(182.9cm), and steam dome is 9" (22.9cm).
NOTE: Sensor from steam unit will be mounted to bottom
corner plate of steam dome. If routing of wire through fin-
ished wall is preferred, do so before installing finished
wall.
Prior to proceeding with steam dome installation, install
finished wall. Dome installation must be to finished wall.
Prior to proceeding with steam dome installation, install
Whitecap unit (if used), Glassworks doors, and all
associated accessories (steam generator, control,
sensor, and steam outlet).
AB
112896-2-
Before starting any installations, remove all supplied
parts from wrappings, boxes or bags. Inspect all parts for
damage. Use care when handling glass. Check all parts
against exploded view, parts list and mounting hardware
illustration. Notify place of purchase if parts are missing
or broken. Read complete assembly instructions before
beginning. Review illustrations with instructions.
S
Drill Bits
S
Screwdrivers
S
Level
S
Fine File
S
Center Punch
S
Pencil
S
Safety Glasses
Lag Bolts
(4 Req'd.)
RECOMMENDED
Lag Bolts
(2 Req'd.)
ALTERNATE
FRAMEWORK
2
Screws #8 x 18
(3 Req'd. Each Side)
FRAMEWORK
Screws #8 x 18
(4 Req'd. Each Side)
Kohler Co., Kohler, WI U.S.A.