Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
English
Operation Test
Connect the UPS to the wall receptacle.
Push on the Main Switch to check the Green Line (
Connect your computer equipment with sockets of the UPS and pull
off the input power cable of the UPS from the wall receptacle to
check if the Line (
please check if alarm buzzer is beeping.
Try the field working condition by running some application programs
on your computer and repeating step.
Check if the UPS is initiated properly to support continuous operation.

IMPORTANT NOTICE:

Plug the UPS into the wall outlet to charge the UPS for over 8 hours before
using the UPS.
STORAGE:
Store at -15 to +30 °C (+5 to +86 °F), charge the UPS battery every six
months.
Store at +30 to +45 °C (+86 to +113 °F), charge the UPS battery every
three months.
) LED is flashing every 3 seconds. Meanwhile,
) LED is on.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cups800

Tabla de contenido