Flex DD 2G 10.8-EC Instrucciones De Funcionamiento Originales página 21

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 52
DD 2G 10.8-EC / PD 2G 10.8-EC
 Release unlocking ring. Check that the
attachment is locked in position.
Disassemble
 Pull unlocking ring forwards and remove
angle attachment.
Inserting the tools
The angle attachment has a ¼" tool holder.
Screwdriver bits and bit holders are securely
held in the tool holder.
The keyless chuck (see "Changeable drill
chuck BF 10.8-EC") or the bit holder (see "Bit
holder attachment BV 10.8-EC") can be
mounted on the angle attachment.
Bit holder attachment BV 10.8-EC
CAUTION!
Before carrying out any work on the power
tool, move the direction preselector switch (2)
to the middle position.
Assemble
 Pull unlocking ring forwards (1.) and press
bit holder attachment all the way onto the
tool holder (2.).
 Release unlocking ring. Check that the bit
holder attachment is locked in position.
Disassemble
 Pull unlocking ring forwards and remove
bit holder attachment.
Inserting the tools
The bit holder attachment has a ¼" tool
holder. Screw-driver bits are securely held in
the tool holder.
 Pull tool lock forwards (1.) and press in
the tool all the way (2.).
 Release tool lock.
 To remove the tool, pull tool lock
backwards.
21

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pd 2g 10.8-ec418.005

Tabla de contenido