1.
Place the sealer on a flat working surface.
2. Locate the "Air In" port on rear.
3. Attach clean, dry air supply using
tubing (supplied with sealer).
4. Verify air pressure.
CAUTION! DO NOT exceed 85 psi.
START-UP
WARNING! Keep fingers away from seal jaw.
1.
Insert plug into 120VAC, 60Hz outlet.
2. Turn sealer ON by pressing main power switch.
3. Set Heat Timer at #2 position (2 seconds) and Cool
Timer at #1 (6 seconds).
OPERATION
IMPORTANT! If you are vacuuming a granular or
fine substance, the machine will need a filter.
Failure to use a filter will clog the ejector and
the machine will not be able to vacuum.
1.
Load the product into the bag and place the bag
opening over the nozzle (between the sealing jaws).
Pull the bag so its seal area is straight and crease-
free.
2. Press Foot Switch. Jaws will close and Heat Timer LED
will illuminate.
3. Remove bag and inspect seal. If the seal is weak,
increase Heat Timer slightly. Adjust Cool Timer to
allow plastic to cool before pressure bar reopens.
4. Hold Foot Switch until desired vacuum level is
achieved. Sealing cycle will initiate when Foot
Switch is released.
5. The sealing jaws will automatically release when
heating and cooling cycles are completed. The
machine will then return to its pre-set heating and
cooling cycles.
6. Continuously monitor seal area. If the area
overheats, lower heating time and increase
cooling time.
PAGE 2 OF 12
OPERATING INSTRUCTIONS
/
" OD plastic
1
4
7. At the end of each shift or production run, turn sealer
OFF by pressing the Main Power Switch.
NOTE: Sealing cycle may be aborted at any
time by turning Main Power Switch to "OFF."
HEATING TIPS
• Uline recommends cooling time should be double
the heating time.
• To extend element life and avoid overheating, set
Heat Timer at the lowest number for the required
seal. Slight adjustments can significantly change
results.
VACUUM TIPS
• For sealing heavy bags, heat time may need to be
increased slightly.
• Practice the above process by setting the Heat Timer
at zero and operating the machine in the vacuum
mode only. This allows the operator to become familiar
with the vacuum process without wasting bags.
• If available, attach the optional support tray. The
tray aligns the product with the nozzle, leaving the
operator's hands free to work with the bag.
• The most desirable operator position is normally at
waist level. Otherwise, bag may be misaligned with
nozzle, affecting the evacuation flow.
• Move product as close to the nozzle as possible
without interfering with front vacuum bar. The
product's thickness will prevent the bag from
collapsing in front of the nozzle.
• If the product is thick or bulky, reposition slightly
further from the vacuum jaw to prevent creases in
the seal area.
• As the vacuum jaw closes, gently pull the bag back
and up, away from the nozzle. Otherwise, the bag
may collapse in front of the nozzle.