Uline H-1075 Manual Del Usuario página 3

Selladora al vacio - 20"
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSPECTIONS
At the start of each shift or production run, inspect the
seal jaw area.
1. Check the Teflon
tape covering the heating
®
element for wrinkles, bumps or burn marks. If present,
remove and reapply covering to smooth them out.
For burn marks, replace with new Teflon
2. Inspect the element for kinks or signs of overheating.
If present, replace with element of same length
and width.
3. When replacing an element, also check Teflon
cover and EPA's insulated backing under the
element. Replacement is necessary if burns,
bubbles or other surface defects are present.
Acorn Nut
Foot Switch
PAGE 3 OF 12
covers.
®
Heat Timer
Cool Timer
Vacuum Bar
Pressure Bar
Fuse Holder
MAINTENANCE
4. Also check the Pressure Bar for burns and replace
if necessary.
CLEANING
CAUTION! Prior to cleaning, always unplug the
machine. NEVER immerse or spray the sealer
with a hose. Failure to follow these instructions
can lead to fire, electrical shock or premature
machine failure.
Use ONLY denatured alcohol or soap and water to wipe
down your sealer.
®
REFERENCE
Main Power Switch
Retractable Nozzle
Foot Switch
Power Cord
"Air In" Port
0721 IH-1075

Publicidad

Tabla de contenido
loading

Tabla de contenido