Westfalia 305 213 300 107 Instrucciones De Montaje página 12

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
Check operation
14. Re-connect ground of vehicle battery.
15. Adapt the vehicle coding on the following control units using guided troubleshooting, by
changing them to "Trailer coupling fitted 1D2": Confirm suggested code. Codings may only be
carried out by the Software Version Management –Code (SVM).
Note
Changing the code also affects the cooling system control unit in the vehicle. Depending on
the previous vehicle fitting, you may therefore have to adapt the vehicle's cooling system
when retrofitting the towing hitch. You will find more information on this in the Service-Net.
16. Using the Software Versions Management (SVM) system of the selected diagnostics, perform
an on-line document retrieval for the vehicle with the action number 050200.
17. Check the entries in the error log, and delete them if necessary.
18. Check the operation of the trailer using suitable test equipment (with load resistances) or with
a trailer.
19. Secure all cables with cable ties.
20. Re-fit all disassembled parts.
12
305 213 391 101 - 007 - 07/09
Installation Instructions:
Electrical System for Towing Hitch
Audi A4/B8, A5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

305 213 300 113

Tabla de contenido