9) PREVENTIVE MAINTENANCE
9) PREVENTIVE MAINTENANCE
NOTE
1. Items 5A and 6A/B/C and D must be carried out by the nearest Schulz Authorized Technical/Distributor .
IMPORTANT
The above instructions are based on normal operation conditions. If the compressor is installed in a polluted
area, increase inspection intervals.
CRANCKCASE
PLACE
FAN
CYLINDER COVER
COVER
MS 3
MS 3
MS 3
MSV 6
MSV 6
CSV 15
MSV 6
MODEL
CSA 6.5
CSA 6.5
MSV 12
MSV 12
CSV 20
MSV 12
MSV 18
MSV 18
N x m
6.0*
8.0*
6.0
17.0
25.0
6.0
* When refasten bolt to use in the thread "Loctite 243-Blue".
TABLE 4 - BOLTS TORQUE SPECIFICATION
IMPORTANT
Switch off the air compressor, remove the water and exhaust the air from the tank at the end of every working day.
10) CORRECTIVE MAINTENANCE
10) CORRECTIVE MAINTENANCE
To assure product SAFETY and RELIABILITY, repairs, maintenance and adjustment should be performed
by Schulz Authorized Technical/Distributor always using identical replacement original parts Schulz.

11) TROUBLESHOOTING TIPS

11) TROUBLESHOOTING TIPS
Many times, what initially looks like a defect can be solved without the help of Schulz Authorized Technical/
Distributor. If the problem persists after the following corrective actions were taken, get in touch with the nearest
Schulz Authorized Technical/Distributor.
PROBLEM
PROBABLE CAUSE
Voltage drop or electric
supply is out.
Damaged motor.
Motor doesn't start or
Thermal protector went off
doesn't re-start.
(MS 3, MSV 6, CSA 6.5, MSV 12
Obs.: Don't insist on
and MSV 18).
starting up the motor
again. Do it only after
you discovered and
eliminated the cause
Tank is full of air.
of the problem.
Start key with FT1 activate.
Check valve does not seal
because of impurities.
Reduced air production
The demand is above the
(pressure gauge keeps
compressor's capacity.
on showing a lower
Filter element clogged.
pressure than
that of the job).
Air leakage in the compressor.
High ambient temperature
(max. 40°C - 104°F).
Incorrect rotation direction.
(Correct rotation direction isanti-
The compressor unit
clockwise, viewed from the fan
overheats.
and flywheel).
Demand above compressor's
capacity.
Filter element clogged.
Operating in a non-adequate
Premature wear of the
environment.
compressor unit
internal components.
Loose fastening elements.
Loose fan and flywheel.
Abnormal noise or
Compressor installed
vibrations.
incorrectly.
Damaged connecting rod(s)
bearing and rings.
Loose or unaligned belt
(CSV 15 and CSV 20).
Deficient or inadequate
Motor overheats.
electric supply.
Tank's pressure goes
Water excess in the tank.
up too fast or many
frequent starts (the
normal number
of starts is around
6 an hour).
Too much dust on the pump.
High temperature of
High ambient temperature
the compressor unit.
(max. 40°C - 104°F)
Filter element clogged.
Compressor operates
The system's demand is above
uninterruptedly.
compressor's capacity.
Insufficient pressure
Regulator not adjusted.
for the job.
Compressor does
Pressure switch with mechanism
not start
actuated or damaged.
Further information can be obtained at the nearest Schulz Authorized
IMPORTANT
Technical/Distributor or (cta.export@schulz.com.br).
CYLINDER
CYLINDER TO
CONNECTING
FLANGE FLYWHEEL
CRANCKCASE
ROD
CENTER
MS 3
MSV 18
MSV 6
CSV 15
CSV 15
CSV 15
CSV 15
CSA 6.5
MSV 12
CSV 20
CSV 20
CSV 20
CSV 20
MSV 18
17.0
30.0
25.0
25.0
4.0
WHAT TO DO
Check the installation and/or wait for
the electric supply stabilization.
Send it to nearest Schulz Authorized
Technical/Distributor.
Motor will re-start as soon as
temperature decreases. In case it
happens again, send compressor to
a Schulz Authorized Technical/
Distributor.
Motor will re-start as soon as pressure
in the tank decreases (up to 4 bar
(60 psig)).
Reset the button.
Send the compressor to the nearest
Schulz Authorized Technical/
Distributor.
Evaluate compressor's capacity.
Replace it.
Re-fasten bolts and/or fittings.
Improve installation conditions.
Take compressor to the nearest
Schulz Authorized Technical/
Distributor.
Evaluate compressor's capacity.
Replace it.
Improve local conditions and take
compressor to the nearest
Schulz Authorized Technical/
Distributor.
Find and re-fasten them.
Re-fasten it.
Verify item 3 - Chapter 7 - Installation.
See Chapter 9 - Preventive
Mai tenance, items 5 and 6.
n
Adjust it (them) according to Figures
18 and 19.
Have a specialized electrician
check it.
Drain the tank as indicate in
Figures 13 and 14.
For your comfort install an electronic
drain.
Clean the pump externally.
Improve installation conditions.
Replace it.
Evaluate compressor's capacity.
Adjust it, see note the item 2 on
Chapter 8 - Start Procedure.
Depressurize the tank to 60 psig
(4 bar). If the compressor does not
restart, call a Schulz Authorized
Technical/Distributor.
12) MSV 6/50 - SPLIT INSTALLATION
12) MSV 6/50 - SPLIT INSTALLATION
CRANCKSHAFT
COVER
COUNTERWEIGHT
CSV 15
CSA 6.5
CSV 20
12.0
8.0
13) ENVIRONMENTAL GUIDANCE AND RECOMMENDATIONS
13) ENVIRONMENTAL GUIDANCE AND RECOMMENDATIONS
13) ENVIRONMENTAL GUIDANCE AND RECOMMENDATIONS
1. Disposal of Liquid Effluents
The presence of liquid effluents or non-treated condensation from tank in rivers, lakes or in other water receiving
bodies may adversely affect the aquatic life and the water quality as well.
The condensation withdrawn from the tank, daily, according to the Preventive Maintenance Chapter 9, must be
kept in a container and/or in an appropriate collecting network for further treatment.
Schulz S.A., recommends that the liquid effluent produced inside the receiver of the compressor should be
adequately treated through processes that aim at protecting the environment and the healthy quality of life of the
population, complying with the country current regulation requirements.
Among the treatment methods available, one may choose the physical-chemical, chemical, and biological ones.
The treatment may be carried out by the company itself or by outsourcing.
2. Disposal of Solid Waste (parts in general and product packages)
The generation of solid waste is an important aspect that must be considered by the users when using and
maintaining their piece of equipment. The impacts to the environment may cause meaningful changes in the
quality of the soil, in surface and underground water, and in the population health, due to the inadequate disposal
of the discarded residues (on streets, water springs, landfills, etc).
Schulz S.A., recommends that the waste arising from the product, from its generation, handling, transportation,
and treatment to its final disposal should the handled carefully. Appropriate handling should consider the
following steps: quantification, qualification, classification, reduction at source, pick-ups and selective pick-ups,
recycling, storage, transport, treatment and final destination.
The disposal of solid waste must be carried out according to the regulation requirements of the current legislation
of the country the product has been exported to.
14) LIMITED WARRANTY
14) LIMITED WARRANTY
Schulz S.A., assures this product's first buyer/user a warranty against any manufacturing fault that develops within
1 (one) year (including the legal warranty - first 90 (ninety) days) from date of purchase invoice issuing.
GENERAL WARRANTY CONDITIONS
A.
The warranty servicing will be made upon purchase invoice presentation. If the client/owner of this product
wishes to be attended to at home, an Schulz Authorized Technical/Distributor may charge a visit free or in
accordance to local norm and legislation.
B.
Any warranty service should be realized exclusively by Schulz Authorized Technical/Distributor.
C.
Parts that are naturally worn out by regular use and that are affected by the installation and the way the product
is used are excluded from this warranty, such as: air filter element, gaskets, valves, rings, cylinders, pistons,
connecting rods, crankshaft, pressure switch, belt, star key, roller bearings, regulator valve and drain petcock.
Schulz S.A., will only take responsibility on the servicing expenses of the above mentioned parts if an
Authorized Technical/Distributor
D.
This warranty will not apply to cleaning and installation services, lubricate bearing, neither to any damage
caused to the product external parts due to incorrect use, neglect, modifications, use of inadequate
accessories, inadequate use, falls, drillings, use not according to the owner manual, electrical connections in
the wrong voltage, voltage conversion of the electric motor inadequate for the compressor or electrical supply
nets subject to excessive voltage drops or voltage overloads.
E.
Electric motor and electric key manufacturers assume the warranty of their products if they fail for
manufacturing defects. Defects caused by bad installation are not covered by this warranty.
F.
Representatives or dealers are not authorized to receive a product to send it to a Schulz Authorized Technical/
Distributor, take it from there to return it to the client or provide information on Schulz S.A. behalf about the
servicing.
Schulz S.A. or any Schulz Authorized Technical/Distributor will not be responsible for eventual damages or
delays resulting from the non-accomplishment of this clause.
G.
Only original Schulz repair for maintenance parts are used.
H.
Will be excluded of warranty any repair or indemnification of damages occurred during the product transport.
WARRANTY TERMINATION
This warranty will be considered void in the following situations:
A.
At the end of its validity.
B.
When the product is delivered for servicing to non-authorized shops; signs of violation to its original features
can be noticed; when it is assembled out of the manufacturer's standards.
WARNINGS
A.
This compressor technical data were customized: displacement, tension (V) and operation pressure were
specified in the purchase order at Schulz distributor.
B.
Lubrication of your reciprocating piston compressor oil free is fundamental. Maintenance of proper is
paramount and has been discussed numerous times in this manual.
C.
The deadline of a servicing will be shown in the service report, on the date a product is delivered at a Schulz
Authorized Technical/Distributor.
D.
It's the purchaser responsibility to pay for service expenses, which are proved unfounded.
E.
Dealers, representatives or Schulz Authorized Technical/Distributor are not authorized to change this Term or
take responsibilities on Schulz S.A. behalf.
F.
Figures and photos are only for orientation.
G.
The technician will provide service on a come first served basis.
Note:
Schulz S.A., reserves the right to make technical and design changes without prior notice.
R u a D o n a Fr a n c i s c a , 6 9 0 1
Fo n e ( 5 5 ) ( 4 7 ) 34 5 1 60 0 0 Fa x ( 5 5 ) ( 4 7 ) 3 4 5 1 6 0 5 5
C E P 8 9 2 1 9 6 0 0
s c h u l z @ s c h u l z . c o m . b r
w w w. s c h u l z . c o m . b r
Installation guide:
Installation guide:
ODONTOLOGICAL
OFFICES
COMPRESSOR
ROOM
RECEPTION
COMPRESSOR UNIT
TANK
FIGURE 20
detects manufacturing defects.
P E Ç A S
O R I G I N A I S
PIEZAS ORIGINALES / ORIGINAL REPLACEMENT PARTS
DPTO EXPORT
Phone
(55) (47) 3451-6252
Fax
(55) (47) 3451-6051
INFORMACI N TÉCNICA
TECHNICAL INFORMATION
c t a . e x p o r t @ s c h u l z . c o m . b r
Schulz of America, Inc.
3420 Novis Pointe
Acworth, GA 30101
J O I N V I L L E S C B R A S I L
Phone # (770) 529-4731 / 32 / Fax # (770) 529-4733
sales@schulzamerica.com
www.schulzamerica.com
Schulz
Ó

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido