Installation; Typical Installation: Over-Sink Installation M/Smb; Installation Instructions - clage M-O Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 171
M 3...7-O

Installation

2. Installation
Installation, initial operation and maintenance of this appliance must only be con-
ducted by an authorised professional, who will then be responsible for adherence to
EN
applicable standards and installation regulations. We assume no liability for any damag-
es caused by failure to observe these instructions!

2.1 Typical installation: over-sink installation M/SMB

Fig. 3: "Installation diagram with SMB tap" (dimensions in mm)

2.2 Installation instructions

The heater is installed directly on the SMB or SME special tap. We guarantee trouble-free oper-
ation of the instantaneous water heater only if CLAGE fittings and accessories are used. Note
the following during installation:
• Installation must comply with DIN VDE 0100 and EN 806 and with the statutory regulations
of the country and the provisions of the local electricity and water supply company.
• Check the technical data and information on the rating plate.
• Easy access to the instantaneous water heater must be guaranteed at all times for mainte-
nance purposes. An separate shut-off valve must be installed.
• Only use the appliance with an open-outlet tap.
• Ensure that all accessories are removed from the packaging.
• The water pipe must be securely embedded in the wall and it must be stable.
• The minimum requirements for the required water resistance must be complied with. The
required water resistance of the can be obtained from your water supply company.
• The minimum requirements for the required water resistance must be complied with. The
required water resistance of the can be obtained from your water supply company.
20

Publicidad

Tabla de contenido
loading

Tabla de contenido