Reassembly of Humidifi er Parts
1. Set the Lower Reservoir on the flat,
hard surface you have chosen.
2. Attach the Upper Reservoir to the
Lower Reservoir by engaging the two
tabs on the sides. See Figure 14.
Water Tank
Tank Cap
Power Pack
Atomizer
Upper
Reservoir
Tab
Lower
Reservoir
Figure 14
3. Place the Atomizer in the Upper
Reservoir, aligning the three oval holes in
the Atomizer with the three prongs in the
Upper Reservoir. The side of the Atomizer
with three short posts should be facing
upward. See Figure 15.
41786-01 08/04/2005
41786-01/-02_rev 08.01.05.indd 9
Posts
Atomizer
Figure 15
4. Assemble the Pump Cap and the
Funnel Pump by aligning the arrows on
both components and inserting the Funnel
Pump into the Pump Cap. Twist the Fun-
nel Pump counter-clockwise until the two
components snap together. See fi gures 16a
and 16b.
Pump Cap
Funnel
Pump
Figure 16a
Arrows
Figure 16b
9
Pump
Cap
Funnel
Pump
continued
©2005 HUNTER FAN CO.
8/4/05, 4:05:44 PM