Descargar Imprimir esta página

Eaton Metalux IB519013EN Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

3.
Wire input AC to the fixture, including the unswitched
circuit for the battery pack. Wire according to code.
(Figure 6).
QD
To unswitched
Input AC
circuit
Figure 6.
4.
Connect wires from test switch to wires from Battery
pack and fasten test switch mounted plate to Junction
box (not supplied). Wire according to code. (Figure 7).
Junction Box
(by others)
Test Switch
Figure 7.
Ground
Installation Instructions - Steeler LED Battery Pack
5.
Connect wires coming out of KO hole and push wires
back in to fixture. (Figure 8).
Figure 8.
6.
Cover KO with fitting provided. (Figure 9).
Fitting
Figure 9.
EATON
IB519013EN
Threaded
Pipe Shown
Connect Battery pack
charging circuit
Sensor
Installation instructions
3

Publicidad

loading