Eckerle EE 1200 Manual De Instrucciones página 19

Ocultar thumbs Ver también para EE 1200:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3. INSTALLATION OF THE EE 1200 PUMP WITH ASSEMBLY KIT FOR
ARTIPLASTIC® DUCT 08 :
Clean all elements of the a/c unit's drain, in order to ensure that the
condensate water to be pumped will be clean.
The drain tank should be deep enough such that it is capable of containing the
water, above the alarm level, which will continue to flow from the evaporator
in the event of a power failure.
Choose if the pump will be
installed on the right or on
the left side of the air-
conditioner. For simplicity,
the
following
only an installation to the
left of the a/c unit.
Mark the position of the
elbow and duct fixing holes.
Take care at the dimension
of the cover, which is about
10mm longer as the basis.
Drill the holes and insert the wall-plugs.
Fix the elbow, the polystyrene hull and the duct.
Eckerle Industrie-Elektronik GmbH, Otto-Eckerle-Strasse 12A, D – 76316 Malsch/Germany
Tel +49 (0)7246-9204-0 Fax +49 (0)7246-9204-44
illustrates
- 19 -
www.eckerle.com
info@eckerle.com
About 10
mm to
verify with
the cover

Publicidad

Tabla de contenido
loading

Tabla de contenido