Descargar Imprimir esta página

Ubbink Ouessant Instrucciones De Montaje página 7

Publicidad

smooth and level.
SUMMARY:
nozzle and the skimmer
planks. Position the horizontal reinforcements level with the upper edge on the exterior of the structure. Make level and screw together from the pool interior, until screw
heads to not protrude.
5m – Put in the skimmer seal and the frame.
5n – Screw in the whole skimmer.
5o – Cut out the liner on the inside of the skimmer frame.
5p –The water is at the correct level when it is halfway up the skimmer.
7
Start up the pump. When the pool cleaner is not in use, shut off the automatic pool cleaner point stop valve and open the skimmer stop valve. Refer to the notes about the
automatic pool cleaner for more details.
¡
¢
£
¤
¥
¦
§
§
¨
©
¦
§







§








#
not tighten up.
To imperatively check alignment of wedges (chalk line) and diagonals (10 m ribbon); A = B
Mark in the position of the holes with paint or felt tip pen.
Remove the post and its plinth, drill the holes, reposition, drive in the anchoring pins and tighten. Repeat the process on each plinth.
17
§








!
"
©

Publicidad

loading