Initial Operating Procedur; Hot Water Flow Control Valve - meibes LogoVital Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 32

7. Initial operating procedur

• The system is put into operation after flushing and filling the module and after the leak test.
• All heating and sanitary installations must be completed.
• The module must be ventilated during start-up, if necessary.
During the initial operating procedure, please note the instructions found in our service booklet regarding guideline variables and settings
values for the applied control fittings.

7.1 Hot water flow control valve

LogoVital stations are equipped with a hot water flow control
valve „Y" on connection couplings of the proportional flow
controller, found on the sanitary side. Replacement is easy
due to the design as a stationary seal ring.
If necessary, the following flow control plates can be used:
12 l/min:Colour coding - red
17 l/min:Colour coding - brown
19

Publicidad

Tabla de contenido
loading

Tabla de contenido