start the water cleaner, it is therefore necessary
to set the switch on position "ON"; after that
press the pistol trigger: the Automatic Stop
System will start the machine and will stop it
automatically when the trigger is released. It is
advisable to put on the safety of the pistol trig-
ger whenever the machine is stopped, in order
to avoid unintentional starting.
out pressing the gun trigger is attributable
OFF position.
supplied as standard equipments made cor-
regulator:
more than 1 minute.
>
The performances of the machine are suitable
for a professional use. Structural technologies
have been studied to assure high reliability
and safety levels, and long life. It is absolutely
forbidden to use the machine in potentially
explosive environments or areas. The work-
ing temperature must range between +5° and
tion to the structure and to any elements of the
machine.
CORRECT USE OF THE MACHINE
surface and must be horizontal.
lation and gas venting must be assured.
users are urged to hold the gun in the correct
position, with one hand on the grip and the
other on the spray rod.
electrical cables or at the machine.
>
UNPACKING
After opening the package, check the entire
unit.
-
until you have consulted an authorized serv-
ice/centre.
-
sons, some accessories can be supplied dis-
assembled; in this case the fitting has to be
carried out following the instructions on this
booklet.
(plastic bags, foamed polystyrene, nails etc.)
should be kept out of children's reach.on
ground and take the pallet off.
>
INSTALLATION AND START-UP
1
ST
START-UP
When starting up for the first time or after a
long period out of use, connect the intake line
-
only for a few minutes so that any dirt is vented
from the delivery outlet.
ELECTRICAL CONNECTION
that of your machine, indicated on the techni-
cal data plate. Your electrical system must be
constructed by qualified technicians capable of
working in accordance with the requirements
of the regulations in force (earth connection,
fuses, differential security breaker, etc).
regulations stated above, the manufacturer
-
IMPORTANT: Regarding three-phase motors,
tric cable to the plug (see electric diagram).
START-UP
Switch on the machine by pressing the switch
(pict. 1, pos.7) and leave it to run for a few min-
utes to eliminate any dirt and air bubbles from
-
the water circuit, then switch it off, connect the
high pressure line to the spray gun (pict. 7A-7B)
and fit the spray rod (pict. 10A-10B).
When the machine is running again, check that
17
EN
-
-