3
3
Figure 4
Frame
Header
Figure 5
12
PAGE 4 OF 12
ASSEMBLY CONTINUED
9
8
Frame
Sill
Figure 6
1-800-295-5510
uline.com
8. Insert rear legs (3) into the outside corners between
the bottom and the side. Bolt leg to side using two
bolts and nuts per leg. (See Figure 4)
9. Place door and frame assembly (8 and 9) over the
locker body. Make certain body sides are inside the
frame and not between the frame. Attach top to frame
header and bottom to frame sill (one bolt each). Finish
by attaching door and frame assembly to the sides
of the locker body (bolts will be shared with the door
and frame on either side). (See Figure 5) If joining a
3-wide unit beside another unit skip to JOINING UNITS
TOGETHER below.
10. With two people, being careful not to put all the
weight on the rear legs, stand unit upright and
place in desired location. Check and tighten all
permanent bolts. (See Figure 6)
11. For 18" deep lockers: Place end of coat rod (10) over
projecting tab of top left coat hook. Bring up the
other end of coat rod and secure it over tab of right
coat hook.
For 12" deep lockers: Secure double hook (11) to
underside of shelf using 2 bolts and nuts.
JOINING UNITS TOGETHER
1. If joining a 3-wide unit beside another unit, temporarily
install a bolt and nut into the third and sixth holes down
from the top of the outer frame(s) that will be joined to
the adjacent locker frame(s). (See Figure 6)
2. With two people, being careful not to put all the
weight on the rear legs, stand units upright and
place in desired location. Remove bolts placed
temporarily. Using those bolts, bolt adjacent units
together through frames. Check and tighten all bolts.
NOTE: If the bolts placed temporarily are not
removed before the frames are joined side by side,
the frames will have a 1/8" gap between them.
3. For 18" deep lockers: Place end of coat rod (10) over
projecting tab of top left coat hook. Bring up the
other end of coat rod and secure it over tab of right
coat hook.
For 12" deep lockers: Secure double hook (11) to
underside of shelf using 2 bolts and nuts.
SECURING UNITS
1. Anchor units to wall or floor. Units are not intended
to stand free and may topple if not secured. (Units
standing back to back should be bolted together.)
CAUTION! Care must be taken to assure that
lockers are set plumb and true before anchoring.
2. Use supplied leveling feet and hardware (12) to level
the unit. (See Figure 6)
0321 IH-4289