Illustration: Install 3 ball valves to connect the control valve and inlet/outlet pipeline. The
valve A is connected between the inlet/outlet; the valve B is connected with the inlet of
the control valve; the valve C is connected in the outlet of the control valve. When repair
the tank, please open the valve A and close the valve B and valve C; When normally use,
please close the valve A and open the valve B and valve C.
-Connecting drain valve must be within 2m. height above this. The optional
overflow line should be above the drain. Installing cutting system water drain lines is
prohibited.
-Each pipeline should be supported with fixed holder independently, avoiding the
control valve be damaged by bearing the gravity from the pipeline.
Notice: Please make sure the drain line and overflow line is connected and close to
sewer, making the waste water flow into the sewer rapidly.
8.3 Setting and usage
8.3.1
Display equipment with LCD
These series of valves allow the program to select two modes, User mode (Foreground) or the Technical mode
(Background).
In the User mode (Foreground), the user can set the time of day, time of Regeneration and water hardness input.
8.3.2
Display equipment with LCD
In the Technical mode (Background) can set the cycle times of Regeneration Anti-washing,Brine slow aspiration
and washing, filling the salt tank and rinsing of the resins, and the valve model,Filtration indicate whether or
decalcification, Volumetric type or time if the resins volume, counter-flow mode or co-current and the days
between regenerations.
50
NASSER
All manuals and user guides at all-guides.com
Figure 8.2 : Installation drawing
-
CEASA