DJI T30 Guia Del Usuario página 7

Ocultar thumbs Ver también para T30:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 65
5. Insert the spreading system cable to the cable strainer at the bottom of the aircraft and connect it to the 12-pin port
inside of the aircraft after detaching the cover on the port.
6. Reattach the bottom cover of the aircraft firmly and make sure that there is no gap between the structures.
7. Perform flow calibration before installing the fenders. Refer to the Spreading System Calibration section for more
information.
a. Place one of the fenders on one side of the spreader base, align the edge of the spreader base to the slots on the
fender, and insert the fender firmly.
b. Mount the fender for the other side in the same way. The screw holes at the point where the two fenders meet
must be aligned.
c. Insert two screws into the screw holes and tighten.
Check the parts on the aircraft and spreading system after installation to make sure that the spinner disk will
not damage the cables or any other part during operations.
© 2021 DJI All Rights Reserved.
6
2
1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

T10

Tabla de contenido