Descargar Imprimir esta página

Uline H-8348 Manual Del Usuario página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

10. Insert rear half lower shelf with cut sections facing
back corners of table frame. Attach rear half lower
shelf to side panels with four M6 x 12 mm bolts using
a Phillips screwdriver. (See Figure 8)
NOTE: Middle shelf may need to be raised to
highest setting to insert lower shelves.
Figure 8
Rear Half
Lower Shelf
11. Attach rear half lower shelf to back panel with two
M6 x 12 mm bolts and two M6 nuts using a Phillips
screwdriver. (See Figure 9)
Figure 9
Back
Panel
M6 x 12 mm
Bolt
12. Insert front half lower shelf with cut sections facing
front corners of table frame. Attach front half lower
shelf to side panels with four M6 x 12 mm bolts using
a Phillips screwdriver. (See Figure 10) If sliding doors
will not be installed, insert plastic shelf caps into
holes in front half lower shelf.
NOTE: Front half lower shelf is optional and can
be attached at a later time.
NOTE: Knockout in back panel can be removed
using a flathead screwdriver and hammer.
Figure 10
Front Half
Lower Shelf
PAGE 3 OF 15
ASSEMBLY CONTINUED
M6 x 12 mm
Bolt
M6 Nut
M6 x 12 mm
Bolt
STOP – IF YOU PURCHASED:
ITEM #
DESCRIPTION
H-8354
60 x 30" Mailroom Table
H-8355
60 x 30" Mailroom Table
with Sliding Doors
H-8348
Mail Sorter Workstation –
50 Slots
H-8349
Mail Sorter Workstation –
50 Slots with Riser
SLIDING DOOR ASSEMBLY
PARTS FOR SLIDING DOOR ASSEMBLY
Sliding Door Channel x 2
M5 x 10 mm Countersunk Screw x 8
1. Attach top sliding door channel to front support
channel with four M5 x 10 mm countersunk screws and
four M5 nuts using a Phillips screwdriver. (See Figure 11)
Figure 11
Countersunk Screw
2. Place left sliding door and right sliding door into
bottom sliding door channel. Left door should be
in back channel and right door should be in front
channel. While lifting into place, place left door into
back channel and right door into front channel of
top sliding door channel. (See Figure 12)
NOTE: Lock may need to be disengaged to
slide doors together.
Figure 12
Left Sliding
Door
Sliding Door
Channel
Right Sliding Door
NEXT STEP
Assembly Complete
Proceed to Sliding
Door Assembly
Proceed to Mail Sorter
Workstation Assembly
Proceed to Mail Sorter
Workstation with Riser
Assembly
Left Sliding Door
Right Sliding Door
x 1
M5 Nut x 8
Front Support
M5 Nut
Channel
M5 x 10 mm
0721 IH-8348
x 1

Publicidad

loading