Tabla De Contenido; Transportation; Installation Location - Acson international 5ACV 100 CR Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 48
Please take note of the following important points when installing.
• Do not install the unit where leakage of flammable gas may occur.
If gas leaks and accumulates around the unit, it may cause fire ignition.
• Do not overcharge the unit.
This unit is factory pre-charged. Overcharge will cause over-current or damage to the compressor.
• Sharp edges and aluminium fin coil surface are potential location which may cause injury
hazards. Avoid from being in contact with these locations.
The unit should be lifted using a crane. Ensure that the hanger belts are not touching panel
and the coil, top front panel (use protective panel) as shown in Figure 1.
The bolt of the base and channel support can be removed after putting the unit on the fixed
location.
Installation work should be done by the authorized dealer or qualified contractor.
Make sure there is sufficient airflow around the unit.
Vibration isolator should be provided to prevent vibration and noise from the unit.
There should be sufficient space allocated for servicing and maintenance.
All manuals and user guides at all-guides.com
INDEX
page i
page 1
page 1
page 2
page 2
page 3
page 3

TRANSPORTATION

INSTALLATION LOCATION

1-1
page 3
page 4
page 5
page 6
page 7
page 8
page 9
Hanger
Hanging Belt
Protective Panel

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

5acv 135 cr5acv 210 cr

Tabla de contenido