BGS technic 3284 Guia De Inicio Rapido página 5

Ocultar thumbs Ver también para 3284:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

AIR SUPPLY (please refer to the diagram below)
1. Make sure that the air compressor being used for the air tool operation supplies the correct output
(CFM).
2. Turn the throttle in the off position when connecting the tool to the air supply.
3. Use normal 90psi air pressure while running the tool. High pressure and unclean air will shorten
the tool's life due to faster wear and also may create a hazardous situation.
4. Drain the air tank daily. Water in the air line may enter the tool and damage the tool mechanism at
the operation.
5. Clean the air inlet filter cartridge weekly. The recommended hook-up procedure can be viewed in
the diagram below.
6. Line pressure should be increased accordingly to make up for extra long air hoses (usually over 8
meters). The minimum hose diameter should be 1/4 I.D. and the fittings should have the same
inside dimensions. But usually a 3/8 I.D. air hose is recommended for air supply to get the best
function of air tool operation.
7. Use proper hoses and fittings. We do not suggest connecting quick change couplings directly to
the tool since they may cause failure due to vibration. Instead, add a leader hose and connect
coupling between air supply and hose whip.
8. Keep hoses away from the heat, oil and sharp edges. Check hoses for wear before individual use.
Make certain that all connections are in security.
1
1 Air Tool
2 Air Hose
6 Shut Off Valve
7 Whip Hose
11 Air Dryer
12 min. 1" Pipe
INSTRUCTIONS, MAINTENANCE & LUBRICATION
1. Always use the correct size of rivets to fit with the riveter. Any misuse of wrong size of rivets will
cause hazardous situation and damage the tool.
2. Maintenance the Cylinder (please refer to the following 5 illustrations):
1. Disconnect air hose.
2. Use the spanner to take apart the head as fig. 1.
3. Use the spanner to open the bottom cover as fig. 2.
4. Remove the piston of the cylinder as fig. 3.
5. Clean the inside of the cylinder and the frame body.
6. Fill the lubricating oil as fig. 4.
7. Clean the stem of the piston, apply grease to the inner wall of cylinder and the O-ring as fig. 5.
8. Re-assemble the riveter by following the disassembly procedure in reverse.
Fig.1
SW-Stahl und Werkzeugvertriebs GmbH
L
e
v
e
k r
u
s
r e
t S
a r
s
s
e
6
5
D
4 -
2
8
9
7
R
e
m
s
c
h
e
d i
4
3
5
2
7 / 8
9
3 Oiler
8 Coupler
13 Compressor
Fig.2
Tel. +49 (0) 2191 / 46438-0
F
ax +49 (0) 2191 / 46438-40
- E
12
11
6
10
14
4 Regulator
9 Drain Daily
14 Auto Drain
Fig.3
Fig.4
M
a
: l i
n i
o f
@
s
w
s
a t
l h
d .
e
13
15
5 Filter
10 min. 1/2" Pipe
15 Drain Daily
Fig.5

Publicidad

Tabla de contenido
loading

Tabla de contenido