Tripp-Lite BP240V09 Manual Del Usuario página 53

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Installation
12. Install the copper bars (28 pieces) between adjacent batteries and the screws (Figures 5-51A and 5-51B).
Figure 5-51A
Figure 5-51B
13. Connect the cables from battery 1+ to BAT+ copper bar, battery 10- to BAT N copper bar, battery 11+ to BAT N copper
bar, battery 20- to BAT- copper bar and the layer's connecting cables (Figures 5-52A and 5-52B).
Figure 5-52A
Figure 5-52B
53

Publicidad

Tabla de contenido
loading

Tabla de contenido