Troy-Bilt Storm 2410 Manual Del Operador página 10

Ocultar thumbs Ver también para Storm 2410:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7.
Push the chute control rod toward the control panel until
the hole in the rod lines up with the hole in the chute
control input closest to the chute control head and insert
NOTE: The second hole is used to achieve further
engagement of the chute control rod into the pinion
adjustments.
8.
Finish securing chute control head to chute support
bracket with wing nut, clevis pin, and bow-tie cotter pin
Check that the cables are properly routed through the
cable guide on top of the engine. Some models only have
one cable to route through the cable guide. See Figure
NOTE: For smoothest operation, the cables should all be to
the left of the chute directional control rod.
S
3— A
10
ECTION
SSEMBLY
Figure 3-12
Figure 3-13
& S
-U
ET
P
Set-Up
Shear Pins
A pair of replacement auger shear pins and bow tie cotter pins
are included with your snow thrower. Store them in your snow
Figure 3-14
Chute Clean-Out Tool
The chute clean-out tool is fastened to the top of the auger
housing with a mounting clip and a cable tie at the factory. Cut
Figure 3-15
Chute Clean-Out Tool

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Storm 2620Storm 2840

Tabla de contenido