5
[Fig. 5.1.1]
B
A Unit body
B Lifting machine
6
[Fig. 6.2.1]
[Fig. 6.3.1]
Max. 20m
1.5-2m
B
A
K
B
D
E
F
F
H
[Fig. 6.3.2]
E
A
35
32
C
D
B
[Fig. 6.4.1]
A
B
E
F
A
A
270
C
L
M
D
D
F
G
I
A Indoor unit
B Tie band (accessory)
F
C Visible part
D Insertion margin
E Drain hose (accessory)
F Drain pipe (O.D. ø32 PVC TUBE, field supply)
G Insulating material (field supply)
25
G
D
H Tie band (accessory)
H
A Insert pump's end 2 to 4 cm.
B Remove the water supply port.
C About 2000 cc
D Water
E Filling port
F Screw
C
D
5.1
[Fig. 5.1.2]
C Nuts (field supply)
D Washers (accessory)
E M10 hanging bolt (field supply)
6.2
A Drain pipe (O.D. ø32)
6.3
Max. 300mm
N
B
J
F
O
6.4
[Fig. 6.4.2]
<Indoor controller board>
C
D
D
C
E
Correct piping
Wrong piping
A Insulation (9 mm or more)
B Downward slope (1/100 or more)
C Support metal
K Air bleeder
L Raised
M Odor trap
Grouped piping
D O. D. ø32 PVC TUBE
E Make it as large as possible. About 10 cm.
F Indoor unit
G Make the piping size large for grouped piping.
H Downward slope (1/100 or more)
I O. D. ø38 PVC TUBE for grouped piping.
(9 mm or more insulation)
J Up to 550 mm
N Drain hose (accessory)
O Horizontal or slightly upgradient
SWE
3