Installation
Mounting the range hood blower
•
Slide the rear mounting plate flange under the bracket.
A.
Bracket
B.
Blower mounting plate
•
Push the front end of the mounting plate up and snap into
spring tab.
NOTE: The spring tab should be outside of the slot in the
mounting plate.
A.
Blower mounting plate
B.
•
Align mounting holes and install 4 - 6 x 16 mm screws.
A
B
A.
Screw with lock washer
B.
•
Attach power cord connector to connector on wire box on
blower motor mounting plate.
A
A
B
Spring tab
Mounting hole
Ceiling support structures
•
This vent hood is heavy. Adequate structure and support
must be provided in all types of installations.
•
At the hood location, install 2"x 4" cross framing between
ceiling joists as shown (2"x 4" are required to support
the weight of the hood).
B
•
Arrange cross framing in the ceiling to suit the existing
structure.
Your ceiling joists will be like one of the following:
NOTE: Top view ceiling joists
parallel to front of hood
16"
(17.9cm)
(40.6 cm)
joist spacing
NOTE: Top view ceiling joists
parallel to front of hood
16"
(40.6 cm)
joist spacing
(17.9cm)
NOTE: Top view ceiling joists
parallel to front of hood
10
⁄
" (25.5 cm)
1
1 6
install cross-framing
symmetrically over
duct/cooktop
(17.9cm)
(40.6 cm)
joist spacing
Hood front
Example A
10
⁄
" (25.5 cm)
1
1 6
install cross-
framing
symmetrically
over duct/cooktop
Centerline
Ø 8
⁄
" (21
7
⁄
"
1
1
4
1 6
cm) duct
Align duct to
center of cooktop
Hood front
Example B
10
⁄
" (25.5 cm)
1
1 6
install cross-
framing zz
symmetrically
over duct/cooktop
Centerline
7
⁄
"
1
Ø 8
⁄
" (21
1
1 6
4
cm) duct
Align duct to
center of cooktop
Hood front
Example C
Centerline
2 x 4 cross
7
⁄
"
1
Ø 8
⁄
" (21
1 6
1
4
cm) duct
16"
Align duct to
center of cooktop
2 x 4 cross
framing
Cooktop
outline
2 x 4 cross
framing
Cooktop
outline
framing
Cooktop
outline
7