Bradley S19-320EXP120 Instalación página 6

Sistema de alarma del interruptor de flujo, clase i, división i, grupos c y d, a prueba de explosiones (incluye las versiones de 120v y 220/240v)
Ocultar thumbs Ver también para S19-320EXP120:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Step 5: Test the alarm system
NOTE: Testing the alarm for the first time using the drench shower may expose the flow switch to an
unnecessary water hammer since the downstream piping may be empty of water. The flow switch is
designed to withstand such a water hammer, but using the smaller eye wash flow is recommended.
Refer to Figure 3 when testing the alarm system.
1. Apply power to the alarm branch circuit. The alarm should remain off.
2. Make sure the alarm horn cut-out switch is in the "ON" position (pull the button out).
3. Open the eye wash valve. The alarm should sound and the strobelight flash shortly after water
flows from the system.
4. Use the alarm horn cut-off switch to silence the horn. Pushing the button should shut off the horn
but allow the strobelight to keep flashing.
5. Shut off the eye wash flow valve. The strobelight should stop flashing.
6. Reset the alarm horn cut-out switch by pulling the button out.
7. Repeat the tests in procedures 1-6 above, this time using the drench shower only.
CONDUIT
CONNECTOR
TO POWER
SUPPLY
FLEXIBLE
CONDUIT
Figure 3
6
netzerotools.com
STROBE LIGHT
JUNCTION
BOX
SEAL FITTING
CUT-OUT
TO FLOW
SWITCH BOX
SWITCH
1/19/11
netzerotools.com
NIPPLE
MOUNTING BRACKET
ASSEMBLY
HORN
U-BOLT (qty. 2)
NUT (qty. 4)
JUNCTION
SWITCH
CONDUIT
CONNECTOR
BOX
FLOW
Installation

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S19-320exp1aS19-320exp1bS19-320exp220

Tabla de contenido