Louisville PINNACLE Serie Instrucciones De Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 2: PERMANENT INSTALLATION
A. The ladder comes with pre-drilled holes for permanent installation at locations shown in
Figure 7. Shim, when necessary to fill space between ladder frame and rough opening, at
pre-drilled locations. Using 3/16" drill bit, drill pilot holes through shim into ceiling joists and
header.
B. Install the ten 3" lag screws provided, at each location to permanently secure the ladder.
C. WARNING: Never use deck or sheetrock screws in place of lag screws for
permanent installation.
D. Remove temporary boards from ceiling installed in step 1.
FIGURE 8
"
FIGURE 7
STEP 3: ADJUST LADDER LENGTH
Remove plastic straps holding the sections together and carefully
unfold ladder to the ground rotating bottom section behind
middle section (Figure 8).
6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Aee3010Aee2510Aee2210

Tabla de contenido