Step 1 Slide The Oven Into The Cutout; Step 2 Install Bottom Trim - GE Advantium 120 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 1
SLIDE THE OVEN INTO
THE CUTOUT
CAUTION:
Two people are required to lift the oven
into the opening. Grasp the bottom at the front and
rear. DO NOT USE THE HANDLE TO LIFT THE OVEN.
DAMAGE WILL OCCUR!
MISE EN GARDE :
Deux personnes sont nécessaires
pour soulever le four et l'insérer dans l'ouverture.
Saisissez-le par le dessous, à l'avant et à l'arrière.
N'UTILISEZ PAS LA POIGNÉE POUR SOULEVER LE
FOUR. DES DOMMAGES SE PRODUIRONT !
• Lift and hold the oven at the front of the opening.
Hold the oven at a 45º angle and plug in the power
cord.
• Carefully, slide the oven into the cabinet part way.
Leave the oven a few inches forward of the cabinet
frame.
• Check to be sure the power cord is not trapped
under the oven or along the sides of the oven.
Installation
STEP 2
• Align bottom trim tabs to slots in the bottom of the
oven.
• Secure the bottom trim to the bottom of the oven
using 3 brass screws provided.
8
INSTALL BOTTOM TRIM

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Scb1000Scb1001Zsc1000Zsc1001

Tabla de contenido