GB
Personal protection - preparing for operational readiness
Please note:
Please note: operational readiness requires that the IKAR sleeve has already been installed prop-
erly. Note whether it is horizontal or vertical.
Insert the cantilever arm into the IKAR sleeve.
Release the socket pin (
) by pressing the pressure pin with the thumb and pull out.
A
Then fold the cantilever arm upwards (
) and secure with the socket pin (
).
B
C
The ASS-3 cantilever arm is now ready for basic use.
It is disassembled in the reverse sequence.
A
B
C
Similar to illustration
19