STEP 3 - Install RO faucet
You will need a sink top hole 1 1/4" in diameter for the faucet. If drilling a new
hole, ensure faucet body will mount flat against the surface and there is sufficient
tubing between faucet body and System Manifold.
1
ESCUTCHEON
GASKET
Place the metal escutcheon
and black gasket on the faucet
base and feed the tubing and
faucet threads through the
countertop hole.
3
Measure the white 3/8" tubing from the
faucet to the outlet of the Remineralizer
and cut to desired length. Leftover tubing
will connect manifold to Tank.
Note: Do not connect 3⁄8" white tubing
from Tank to faucet.
NEED HELP? GIVE US A CALL 877.333.7108
2
Slide the metal washer
onto the faucet.
Thread the faucet
nut onto the faucet
threads. Tighten
by hand.
WASHER
FAUCET NUT
5