5.2.4 Connection of several tanks
Two or more tanks are connected via the assembly
surfaces by means of GRAF special seals DN 100 and
basic pipes (to be provided at construction site).
The apertures must be drilled to the corresponding size
using only the GRAF special crown bit. It must be ensured
that the distance between the tanks is at least 600 mm.
The pipes must project 100 mm - 150 mm into the tanks.
5.3

Insertion and filling

The tank must be inserted, impact-free, into the prepared
trench using suitable equipment. The tank is filled with
approx. 25 cm water before filling the tank surround.
Afterwards the surrounding (roundgrain gravel, max. grain
size 8/16) is then filled in layers of max. 40 cm steps and is
compacted.
The individual layers must be well-compacted (manuel
tamper). Damage to the tank must be avoided during
compaction. Mechanical compaction machines must not be
used under any circumstances. The surrounding must be
at least 500 mm wide.
5.4

Routing connections

All feed and overflow pipes must be routed with a decline
of at least 1% in the direction of flow (possible,
subsequent settling must be taken into consideration in
this case). If the tank overflow is connected to a public
sewer, this must be protected against reflux by means of
a lifting station (mixed sewer) or reflux seal (pure
rainwater sewer) according to DIN 1986.
All suction, pressure and control lines must be routed in
an empty pipe, which must be routed as straight as
possible, without bending, to the tank with a decline.
Necessary bends must be formed using 30° moulded
sections.
Important: The empty pipe must be connected to an aperture above the max. water level.
mail@graf.info
www.graf.info
5.
Installation and assembly
16 / 36
Sewe

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

370005370006

Tabla de contenido