Descargar Imprimir esta página

peerless-AV LCZ-4F430B Instalación Y Montaje página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation of Base
Remove base cover from base (A) as shown in fi gure 1.1.
1
Hand tighten pole (C) onto base (A) as shown in fi gure 1.2. Tigthen set screw to secure pole using 3mm allen
wrench (K) as shown in rear view.
BASE COVER
A
Feed cables through base cover. Insert base cover
2
onto pole (C).
BASE COVER
C
fi g 1.1
4 of 23
SET SCREW
REAR VIEW
Insert lock collar (D) onto pole (C).
3
Adjust to desired height and tighten by hand.
ISSUED: 04-05-11 SHEET #: 090-9200-3 05-29-12
C
fi g 1.2
D
C

Publicidad

loading