Installation - Vollrath Mirage 74701DW Manual Del Operador

Ocultar thumbs Ver también para Mirage 74701DW:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION

NOTICE: Installation must be performed by personal experienced
with installing drop-in equipment in a commercial food
service environment.
NOTICE: Failure to follow these directions could damage the
product. Damage due to improper installation is NOT
covered under warranty.
Cutout Openings
1. Choose a flat, level countertop for the mounting surface.
2. Measure the area for the cutouts.
Item
Cut-out Diameter
7 Quart
10⁵⁄₈" (27 cm)
11 Quart
12⁵⁄₈" (32.1 cm)
Control Box
See drawing on page 2.
3. Apply silicone sealant to the cutout areas to prevent moisture from
penetrating the exposed surfaces.
Install the Gasket
NOTICE: Gasket installation is mandatory. Failure to install the
gasket will void the warranty.
1. Turn the equipment so the bottom is facing up.
2. Set the equipment on a stable surface, such as a countertop.
3. Lubricate the gasket with a small amount of liquid dish soap or
water.
4. Carefully press the groove of the gasket onto the underside edge of
the rim. Take care to evenly press the gasket as you feed it onto the
rim, without stretching it.
Rim
Gasket
5. If needed, use a scissors to trim the gasket to the proper length.
®
Mirage
Drop-in Induction Warmers and Rethermalizers Operator's Manual
Install the Drop-in
1. Insert the drop-in into the countertop as shown in the illustration
below.
2. Insert the included four brackets with thumb screws into slots.
Choose slots that position the thumbscrews close to the bottom of
the countertop
3. HAND-TIGHTEN the thumbscrews slowly and in an alternating
pattern. Tighten just to resistance - approximately when the screw
just touches the bottom of the countertop, then tighten an additional
½ turn. Do not over tighten.
NOTICE: Do not use any hand tools when tightening the thumb
screws on this product.
4. If desired, place a bead of silicone caulk between the gasket and the
countertop.
5. Plug the power cord into a grounded electrical outlet with the
matching nameplate rated voltage.
NOTICE: Using a voltage other than the nameplate rated voltage
will cause damage to the unit. Incorrect voltage,
modification to the power cord or electrical components
can damage unit and will void the warranty.
Install the Control Box
1. Use the included four nuts and screws to secure the control box to
the mounting surface.
NOTICE: Tighten the screws to a maximum of 35 in-lbs. Do NOT
over-tighten.
2. Plug the USB cable into the control box and into the bottom of the
drop-in.
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mirage 741101dwMirage 74701dMirage 741101d

Tabla de contenido